International middle school - Noisy-le-Grand (93)

- Operation
- Program
- Technical characteristics
- HQE
Client | CONSEIL GENERAL DE SEINE-SAINT-DENIS |
---|---|
Architect | SCAU |
Area | 10000m² |
Construction cost | 22,000,000€ |
Scope of services | Services, thermal performance and external works |
Delivery date | 2015 |
Programme - EN
Construction of 400-pupil international secondary school including general education centre, open plan secondary school, 400-meal/day canteen, corporate housing, multipurpose sports surface and 140-room internship.
http://bit.ly/1VQCCQt
Particularités Techniques - EN
Space heating and hot water production supplied by mixed system of vertical geothermal probes and gas fuelled boiler. Geothermal energy sized to provide 80% of annual heating requirement. Thermal performance level is passive (Cep < 0 kWh/m²/a). Onsite heating production provided by 1200m² mono-crystalline photovoltaic solar panels equivalent to nominal 200 kW capacity.