Police station - Rueil-Malmaison (92)

- Operation
- Program
- Technical characteristics
- HQE
Client | CONSEIL GENERAL DES HAUTS DE SEINE |
---|---|
Architect | BVFG ARCHITECTES |
Area | 2000m² |
Construction cost | 3,620,000€ |
Scope of services | Structure, Services and quantity surveying |
Delivery date | 2007 |
Programme - EN
Site of former gendarmerie, construction of police station including single-storey public and staff ca park structure, public lobby, custody room, commanding officer post, changing room and sanitary blocs, communications room, armoury, offices, etc.
Particularités Techniques - EN
Cast in situ reinforced concrete frame construction. Underground reinforced concrete storm water tank and gas fuelled boiler space heating system. Temperature control system configured locally or remotely via Ethernet network or Internet. Installation of BMS to control technical plant. Closed-circuit television system, access control and intrusion alarm.