Henri Vidal sports complex - Montfermeil (93)

- Operation
- Program
- Technical characteristics
- HQE
Client | VILLE DE MONTFERMEIL |
---|---|
Architect | A5A ARCHITECTES |
Area | 3100m² |
Construction cost | 7,000,000€ |
Scope of services | Consultant engineer, external works engineer building economist, Haute Qualité Environnementale (HQE) engineer |
Delivery date | 2019 |
Programme - EN
Reconstruction of Henri Vidal sports centre comprising gymnasium (multi-sport hall, national climbing wall, 475-seat grandstand, martial arts (dojo), multipurpose hall), changing room in 300-seat grandstand.
Particularités Techniques - EN
Anchored piles. Reinforced concrete walls, columns, beams and slabs. Steel truss spans in multisport and climbing halls. Grandstand, steel sheet roof on existing steel structure, some elements replaced and anti-corrosion treatment.
Space heating and domestic hot water supplied by ground floor gas boiler room equipped with cogeneration and three condensing boilers. Changing rooms heated by hot water radiators and radiators in offices, corridors, lobby and reception area. Radiant hot water panels installed in sports halls. Premises except sanitary, stores, circulation; double flow ventilation.
Réglementation Thermique 2012 (RT 2012)
Thermal performance Effinergie +