Kindergarden - Villeneuve-le-Roi (94

- Operation
- Program
- Technical characteristics
- HQE
Client | VILLE DE VILLENEUVE-LE-ROI |
---|---|
Architect | JEAN-PIERRE LOTT |
Area | 1215m² |
Construction cost | 3,600,000€ |
Scope of services | Consultant engineer, external works engineer, building economist, Haute Qualité Environnementale (HQE) engineer |
Delivery date | 2020 |
Programme - EN
Construction of 7-classroom school, rue du Maréchal de Turenne; leisure centre and half-board (warming pantry) in new Villeneuve-le-Roi neighbourhood along River Seine.
Particularités Techniques - EN
Deep drilled concrete anchored piles. Raised ground floor. Reinforced concrete walls, columns, beams and slabs. Elevation walls; grey paint finish concrete with curved formwork for architectural expression. Space heating supplied by central gas boiler. Double flow ventilation in classrooms, offices and dining room.
Honeycomb retention/infiltration basin to enable total infiltration of rainwater without overflow into sanitation network.
Haute Qualité Environnementale (HQE) NF HQETM new tertiary buildings certification
Thermal performance to attain Effinergie+