La Butte Verte Gymnasium - Noisy-le-Grand (93)

- Operation
- Program
- Technical characteristics
- HQE
Client | COMMUNE DE NOISY LE GRAND |
---|---|
Architect | BVL ARCHITECTURE |
Area | 4104m² |
Construction cost | 7,100,000€ |
Scope of services | Structure, Services and sustainable development (HQE) |
Delivery date | 2011 |
Programme - EN
Construction of large 44 x 24m gymnasium, 30 x 20m multi purpose hall, 120m² dance room, 400-seat stand and climbing wall.
Particularités Techniques - EN
Steeply sloping site, former landfill that required major decontamination prior to construction. Proposed structure anchored into 6m high cliff that necessitates construction of retaining wall. Pile foundations; laminated glued timber trusses. Halls dual duct ventilation system - BMS - clodes-circuit television. Gymnasium equipped with foam automatic sprinkler system.
Sustainable development approach with 03 (green construction), 04 (energy management) at priority level. Consumption low-energy level RT2005 BBC.