Housing units - Marjolin street - Levallois-Perret (92)

1
  • Operation
  • Program
  • Technical characteristics
  • HQE
Client OPDH 92
Architect ARCHI-TECTURE
Area 5900m²
Construction cost 11,000,000€
Scope of services HVAC, quantity surveying and sustainable development (HQE)
Delivery date In progress
Programme - EN
Construction of 75 housing units at 15-17 and 13 units at 58 rue Marjolin.
Particularités Techniques - EN
Reinforced concrete construction with thermal bridge breakers and internal insulation. Construction of perimeter wall for 2-level underground car park on with temporary walls.
Thermal performance regulation RT2012 (-10%). Installation of waste water heat recovery system to preheat hot water production.