178


Pool - Pierrefitte-sur-Seine (93)

Image1
  • Operation
  • Program
  • Technical characteristics
  • HQE
Client Conseil Départemental de la Seine-Saint-Denis (93)
Architect BVL Architecture
Area 3300m²
Construction cost 0€
Scope of services Structural engineering, and roads and utilities
Delivery date In progress
Programme - EN
Building an Aquatics Complex in Pierrefitte-sur-Seine (93).
Particularités Techniques - EN
The site is set to be a type X, category 3 public access building (301 to 699 users) with a maximum bather load of 650. The pool area will include : 25 m x 20 m swimming pool comprising 10 lanes and with a depth of 1.30 to 2 metres; a 15 m x 10 m activity pool; an edutainment area for children; two footbaths; all with indoor beaches surrounding the pools and forming a relaxation area. Disabled access will be facilitated by the ramp and anchor points positioned alongside the pool, making it possible to install an immersion device.The outside spaces extend from the entrance forecourt, in front of the project’s north side. The Aquatics Centre will have an inner courtyard with a ramp leading to the building’s basement, which will contain the project’s back-of-house areas. This inner courtyard will be accessed via the small vehicle car park (approximately forty spaces) to the east of the building. A coach park will be available for use on the forecourt. On the south side of the centre, an outdoor solarium will be created close to various facilities including a volleyball court.