School campus Sartrouville (78)

Client
Yvelines Departmente

Client assisted by
Altarea

Architect
Gianni Ranaulo Officina

Construction companies
GCC
Léon Grosse

Progress/Delivery date
Preliminary studies ongoing

Surface area
3 007 m²

Construction cost
€48M excluding tax (value date 2022)

Scope of services

  • Structure
  • Electricity
  • Fluids
  • Roadworks and various networks
Learn more

Programme

Overall performance contract for the design, construction, operation and maintenance of a school complex comprising:

  • A nursery school,
  • A primary school,
  • A day-care centre not including accommodation (ASLH),
  • A secondary school,
  • Day-boarding facilities
  • A gymnasium,
  • Staff accommodation.

Technical characteristics

The structure is made of reinforced concrete, with wooden concrete facades.
Double flow ventilation.
Wood-fired heating system for the entire project, except for the day boarding section, which has a gas-fired heating system.

Environmental characteristics

RE2020 with an E3C1 performance level.
Level 3 organically-sourced building label for tertiary buildings. 
High environmental quality (HQE) strategy.