Robert Doisneau secondary school Clichy-sous-Bois (93)

Client
Seine-Saint-Denis department

Client assisted by
SODEDAT 93

Architect
Jean-Pierre LOTT

Construction company
Léon Grosse

Progress/Delivery date
2003

Surface area
7 193 m²

Construction cost
€9,8M excluding tax (value date 2000)

Scope of services

  • Structure
  • Electricity
  • Fluids
  • Roadworks and various networks
  • Construction economics
  • Catering design
Learn more

Programme

Construction of a 600 students middle school including a gymnasium, a canteen and staff accomodation units.

Technical characteristics

Conservation and rehabilitation of the existing building. Demolition of other buildings on the site.
Work carried out on an occupied site with temporary buildings.
Concrete structure; curved sails for the CDI part covered by an exterior resin ensuring waterproofing.
Thermal insulation from the inside.
Double flow ventilation for permanent and half-board.